Outdoor billboard advertising in urban environment

OUR SERVICES

EVERY STRUCTURE. EVERY PROVINCE.

The work that happens before a campaign goes live — and long after it comes down.

THE FIELD PARTNER BEHIND PANAMA'S OUTDOOR MEDIA

Paralelo79 is a specialized outdoor structure contractor. Media owners, agencies, property administrators and public entities hire us for the part that cannot be improvised: the foundation, the rigging, the height, the safety plan and the paperwork.

We work with certified crews, licensed heavy equipment and a structural engineer on staff — which is why international media owners trust us with their inventory.

Paralelo79 outdoor advertising services

WHAT WE DO

FOUR DISCIPLINES, IN DETAIL

01

STATIC BILLBOARDS

Built from the ground up.

Complete construction of billboard and unipole structures: soil study, deep foundation, steel assembly, rigging and final face installation. Turnkey, permitted and documented.

STANDARD FORMAT14×48 ft
STRUCTURESUnipole, wall, rooftop
DELIVERYTurnkey
02

INDOOR ADVERTISING

Where the audience already is.

Production and installation of indoor advertising in shopping malls, terminals and Tocumen International Airport — executed on the venue's schedule, usually overnight.

VENUESMalls, terminals, airport
LEAD TIMESame week
FORMATSStatic, backlit, vinyl
03

BILLBOARD MAINTENANCE

Your inventory, kept in service.

Preventive and corrective maintenance, structural repair, face changes, upgrades, relocations and full dismantling — billboards, pedestrian bridges and urban furniture.

SCOPEPreventive + corrective
ASSETSBillboards, bridges, urban furniture
COVERAGE9 provinces
04

SPECIAL PROJECTS

The formats no one else will attempt.

LEDs, motion, neon, light edges and die-cut extensions, engineered in-house and installed by the same crew that builds them.

DISCIPLINESLEDs, motion, neon
ENGINEERINGIn-house structural
SCALECustom

HOW IT WORKS

FROM SITE VISIT TO SIGN-OFF

01

SITE SURVEY & ENGINEERING

We visit the site, measure it, study the soil where needed, and our structural engineer calculates what the structure has to withstand.

02

PERMITS, LOGISTICS & SAFETY PLAN

Municipal permits, road closures, crane and lift scheduling, and a written safety plan approved before anyone leaves the ground.

03

EXECUTION

Certified crews and licensed equipment. A site coordinator is responsible for the job from mobilization to the last bolt.

04

HANDOVER

The structure is delivered ready for service, inspected and signed off before we leave the site.

LET'S BUILD IT.

Send us the site and the scope. You'll get a quote with a real timeline, not an estimate.

Paralelo79

Panama's outdoor media contractor. Installation, maintenance and dismantling of advertising structures nationwide. Call us at +507 6011-0842.

Services

  • Static Billboards
  • Indoor Advertising
  • Billboard Maintenance
  • Special Projects

© 2026 Paralelo79. All rights reserved.

paralelo79.com